Remove Aeronautical Decision-Making Remove Instrument Meteorological Conditions Remove Runway
article thumbnail

Listen to Your Friends

Plane and Pilot

The CFI told the National Transportation Safety Board (NTSB) the flight review was thorough and commented in the endorsement that the pilot had good aeronautical decision-making skills. It has a 5,890-foot asphalt runway big enough for business jets, with runway and approach lights. There were no replies.

article thumbnail

How to Perform a Go-Around (The Right Way)

Pilot Institute

These include a runway collision, porpoising, bouncing, or possible overrun. ATC can also ask for a go-around if the landing runway is unsafe or for spacing reasons. An approach is stabilized when: The aircraft is on the correct flight path, i.e., on runway centerline and glideslope. Airspeed is not less than 1.3Vso +10/-0.