Remove Approach Remove Indicated Airspeed Remove Threshold
article thumbnail

Going Below Minimums

AV Web

Operations below minimums on an instrument approach can be quite simple if the ceilings and visibilities are significantly above minimums. Lets take a deep dive into what it takes to get an airplane on the ground after a successful instrument approach. Another way to tell the distance is by using the approach lights.

article thumbnail

Delta CRJ-900 Accident In Toronto: Preliminary Report Published

One Mile at a Time

degrees Less than one second before touchdown, the plane had an indicated airspeed of 134 knots, a ground speed of 111 knots, a bank angle of 7.1 The initial impact was 420 feet past the runway 23 threshold. degree bank Two seconds before touchdown, the planes bank angle to the right increased, to 5.9

Descent 87
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Trial by Ice

Air Facts

This particular 172 normally cruised at 120 mph indicated airspeed, but with the ice it would barely do 90 mph and that required full throttle! But the prolonged operation at full throttle and reduced airspeed made a fuel stop at Kirksville, in Northern Missouri a necessity. What had happened? How can this be?

VOR 52
article thumbnail

The Classic Boeing Airspeed Indicator

AeroSavvy

Airspeed Pointer The airspeed pointer shows the indicated airspeed in knots as generated by the Air Data Computer. Digital Data Airspeed The Indicated Airspeed (above 30 knots) is displayed in a digital format. This speed is identical to the speed depicted by the Airspeed Pointer.

article thumbnail

The Flying Bear Goes to Beantown | Part 4, Going Missed

Photographic Logbook

I had no interest in flying one hour north only to be shut out of our destination by weather below minimums for the available instrument approach procedure. ATC was great, the FBO (FlightLevel - Beverly) treated us well and charged reasonable fees, and radar services were managed by the perennially capable Boston Approach.

Ceiling 52